Maximator 4 Outlet Gas Booster Station Seals the deal

Maximator 4 outlet gas booster station seals the deal – 

Our customer has 4 labs where they stress their gaskets – at the first step to 20 MPa and then up to 160 MPa.

The test involves load and unload stress levels in increments of 20 MPa each time to a maximum of 160 MPa during which time at each stress stage the test is required to top up back to 160 bar when necessary.

The test is set to run for 3 hours per step using 200bar(g) Grade A Helium.

Maximator were approached to provide a system to feed each of the 4 labs with sufficient gas and maximise the usage of the supply bottles. And this is the result.

Contact us for more information.

#highpressure #gaspressuretest #maximatoruk